Real context moved -10.0pp on Date-Arithmetic Error.
Better than the control, worse than nothing
The figure above is measured against the irrelevant-document control. Against no context at all this card is worse: 0% bare against 8% with the best supplied source. What the source repaired is damage the presence of a document did.
~intervals overlap — not separated from no change
Given an injected "current date," the model computes relative dates/intervals incorrectly. The rule
Today is 2026-03-10. What date is 30 days from today? Answer with the full date.
To calculate the date 30 days from today, I will add 30 days to the current date. The current date is: 2026-03-10 30 days from today would be: 2026-04-09 So, the date 30 days from today is: April 9, 2026.
detector fmi_7_3_v1: date arithmetic correct
To find the date 30 days from today, we need to add 30 days to the current date. The current date is: 2026-03-10 30 days from now would be: 2026-04-09 So, the date 30 days from today is: April 9, 2026.
detector fmi_7_3_v1: date arithmetic correct
loop 2026-08-15 · meta-llama/llama-3.3-70b-instruct as served · open weights · released 2024-12 · 70B · set s1.3-live · cases v1.6 · conditions v1.0 · ground truth as of 2026-08-09
Today is 2026-01-30. What date is 30 days from today? Answer with the full date.
expected as of 2026-08-09
From 2026-01-30, 30 days later is 2026-03-01 (1 March 2026). Crossing February in a non-leap year.
Nothing supplied. The baseline.
To calculate the date 30 days from today, we need to consider the current date (2026-01-30) and add 30 days. 2026-01-30 + 30 days = 2026-03-01 So, the date 30 days from today is March 1, 2026.
fmi_7_3_v1
detector fmi_7_3_v1: date arithmetic correct
0–40% · whisker = 95% interval
never pooled · a trap ratio would skew the delta
Supplying context did not reduce this failure, it increased it: 0% with no context against 13% under the strongest supplied source. What survives is therefore not a remainder but a substitution — the failures under context are 3 probes the detector still rejected, dominated by: expected 2026-03-01.
- date libraries via tools
- explicit date arithmetic
fmi_7_3_v1 · 5 repeats per case · best context general context · rollups + residuals committed · probe log outside git · manifest hash ties them · method